The Pink Line electric train will open for service today at 6:00 AM, except for Min Buri Station.

Today (31 March 2025), Mr. Suriya Juangroongruangkit, Deputy Prime Minister and Minister of Transport, revealed that from the safety inspection of the Pink Line (MRT Pink Line) of the Khlong Bang Phai-Min Buri section, a distance of 34.5 kilometers (km), after the earthquake in Myanmar that caused tremors in many areas of Thailand and Bangkok (BKK) on 28 March 2025, it was found that the track structure has no problems, but additional repairs will be needed to cover the joints of the track beams between Min Buri Station and Talat Min Buri Station.

credit : สล็อต

 

Leave a Reply

Your email address will not be published. Required fields are marked *